Stages of a building construction

Here are some important sequential steps using which you may plan your housing project in a better way and efficiently. We aim to provide you with a better understanding of construction in a simplified manner.

Stages of a building construction

Stages of a building construction

These steps are; Preparation of drawings as per requirements of consumers. Approval of drawings from City Development Authority. It is most important because residential building drawings should meet the authority defined rules.

Start of construction work either through contractor or labor hired on daily basis.

Steps in the Home Building Process | 10 Step Home Build | NHS

Marking of plot boundaries. Preparation of site layout as per drawing. After the completion of documentation work, the actual construction on plot begins.

Following are the steps; Earth Work Generally excavation is carried out for the construction of wall foundations. After excavation, layout the foundation and backfill the remaining excavated area around foundation with soil. Floor levels of residential buildings are higher than the natural ground level.

Fill the area with soil up to floor levels and compact the soil. Now earth work of residential building is finished. Concrete Work in Foundation It is very necessary to check the levels of foundation before concrete work.

There are patches where excavated depth slightly exceeds and vice versa. Level the foundation base to same level. Now pour the concrete as per drawing specs. Generally concrete of ratio 1: Sometimes it is even 1: Keep foundation width equals to its depth. Damp Proof Coarse D.

C To protect walls from moisture, a layer of damp proof coarse material is laid down at floor level. Thickness of this concrete layer is 0f 1 inch. Material of damp proof coarse layer consists of concrete ratio 1: Masonry Work Masonry work is carried out with cement mortar.

Ratio of cement mortar varies from 1: Dampen about 25 bricks with a hose pipe and clean away all loose dirt from the top of footing and moisten about a meter of surface at one end of the foundation with the hose pipe.

Throw a mortar line just behind the threaded level line and lay bricks on the mortar bed. Make sure bricks exactly follow the threaded horizontal level line. Lintel Masonry work of buildings is carried out in one go till roof.

Reinforced cement concrete beams are laid down on the top of openings. So, those loads of structure above openings not directly come on to the door frames.

Roofing Roof slab of building is poured after completion of masonry works. Now a days, roofing is of reinforced cement concrete slab. Now plaster work begins. Mortar for plaster work is generally of 1: Thickness of plaster layer should not be more than 0.Stages of New Building Construction This article covers basic stages/steps of new building construction and designing.

Here are some important sequential steps using which you may plan your housing project in a better way and efficiently. Building design and construction process – step by step Reasonable people may disagree, but here are the sequential steps in designing and building an ADU. This is an approximation of the steps for my ADU project, anyway.

The design stage is the preliminary stage of a construction project, and the bidding process comes to pass during this project stage. The design team is responsible for making certain that the design meets the regulations and codes of the building.

During the stages of construction, some aspects of the property can sometimes be overlooked or not completed to a high quality. Make a list and make the builder aware in one go rather than going back and forth, which can cause delays. A building inspector will be involved at various construction stages in order to verify that the project is being constructed according to municipal code.

Subcontractors Subcontractors range from a one-man operation to nationwide, publicly traded corporations, or divisions of larger corporations.

Stages in Construction 1. Stages for construction Building Retaining walls Subsoil drainage 2. BUILDING Site works and setting out Accommodation, storage and security Detail building stages.

Stages in Construction 1. Stages for construction Building Retaining walls Subsoil drainage 2. BUILDING Site works and setting out Accommodation, storage and security Detail building stages. Building design and construction process – step by step. Reasonable people may disagree, but here are the sequential steps in designing and building an ADU. This is an approximation of the steps for my ADU project, anyway. This was for an ADU built in Portland, Oregon. The design stage is the preliminary stage of a construction project, and the bidding process comes to pass during this project stage. The design team is responsible for making certain that the design meets the regulations and codes of the building.
Stages of Construction | Shaddock Homes | Dallas Custom Homes